ifference between revisions of "EMK:Modelling North Bank Station in EMarket"
Jump to navigation
Jump to search
Line 2: | Line 2: | ||
[[File:North Bank0.jpg|400px|thumb|right|Figure 1 - North Bank Station]] | [[File:North Bank0.jpg|400px|thumb|right|Figure 1 - North Bank Station]] | ||
The diagram to the right shows the flows, constraints and energy conversion rates in the Waitaki/North Bank system. North Bank is more efficient than Waitaki but a minimum quantity must be passed through Waitaki so the dispatch order is Waitaki (min flow) > North Bank > Rest of Waitaki. A graph of generation against total release is shown below: | The diagram to the right shows the flows, constraints and energy conversion rates in the Waitaki/North Bank system. North Bank is more efficient than Waitaki but a minimum quantity must be passed through Waitaki so the dispatch order is Waitaki (min flow) > North Bank > Rest of Waitaki. A graph of generation against total release is shown below: | ||
− | [[File:NB Gen.jpg]] | + | [[File:NB Gen.jpg|550px|thumb|Figure 2 - Generation against Total Release]] |
Revision as of 16:32, 29 November 2012
The diagram to the right shows the flows, constraints and energy conversion rates in the Waitaki/North Bank system. North Bank is more efficient than Waitaki but a minimum quantity must be passed through Waitaki so the dispatch order is Waitaki (min flow) > North Bank > Rest of Waitaki. A graph of generation against total release is shown below: