ifference between revisions of "EMK:Run Parameters Box"
Jump to navigation
Jump to search
| Line 8: | Line 8: | ||
;Name | ;Name | ||
:The display name of the Run Definition Instance (Developing your own standardized naming convention is recommended. | :The display name of the Run Definition Instance (Developing your own standardized naming convention is recommended. | ||
| + | |||
;Description | ;Description | ||
:A descriptive text field for additional run information. | :A descriptive text field for additional run information. | ||
| + | |||
;Connections | ;Connections | ||
:Specifies the ''''Connections Resource'''' to be used at run time, i.e. the configuration of the Grid and it's connected Generators. | :Specifies the ''''Connections Resource'''' to be used at run time, i.e. the configuration of the Grid and it's connected Generators. | ||
| + | |||
| + | |||
| + | ;Start Date | ||
| + | :The date from which the Run Definition will Forecast from. The Run always begins at 00:00am on the Start Date entered in this field even when a later time is entered. | ||
| + | |||
| + | Example: 30 July 2003 02:30:00. The Run will start at midnight on 30 July 2003. | ||
| + | |||
[[EMK:The Run Definition Editor | Back to The Run Definition Editor]] | [[EMK:The Run Definition Editor | Back to The Run Definition Editor]] | ||
Revision as of 16:10, 7 November 2012
- Run Parameters Box Fields
- Name
- The display name of the Run Definition Instance (Developing your own standardized naming convention is recommended.
- Description
- A descriptive text field for additional run information.
- Connections
- Specifies the 'Connections Resource' to be used at run time, i.e. the configuration of the Grid and it's connected Generators.
- Start Date
- The date from which the Run Definition will Forecast from. The Run always begins at 00:00am on the Start Date entered in this field even when a later time is entered.
Example: 30 July 2003 02:30:00. The Run will start at midnight on 30 July 2003.