Dispatch, Pricing and Power Flows

From EMK Wiki
Revision as of 11:47, 30 November 2012 by Sisep (talk | contribs) (→‎Dispatch)
Jump to navigation Jump to search

Disclaimer Reasonable care has been taken to ensure that the information in this paper is up to date at the time of issue. Potential users of EMarket should, however, ensure that they evaluate EMarket and this paper through an appropriate evaluation process in consultation with Energy Link. The authors are also reliant on certain information external to EMarket and Energy Link, for which no liability or responsibility can be accepted.

Introduction

This technical bulletin is intended to provide users and interested parties with a detailed explanation of how EMarket’s IQP dispatch and pricing module functions, including the DC power flow calculations embedded within it.

Other Documents

This bulletin is one of a series of technical bulletins relating to Energy Link’s EMarket and EMarketOffer (EMO) models. Taken together, the bulletins replace the old EMarket User Guide. A full series of bulletins covers an overview of the EMarket model, the details of the four major New Zealand hydro systems modelled in EMarket, water values and hydro offers, power flows, dispatch and nodal pricing, short term river chain optimisation and company optimisation.

Dispatch

Dispatch and pricing in EMarket and EMO are primarily determined by the methodology specified in Schedule 1 of Part 2 of the New Zealand Electricity Governance Rules (EGRs). The market implementation of these methodologies is currently Trans Power's SPD model which is a large scale LP.

Reserves modelling is required within EMarket, primarily due to their impact on generation. The reserve constraints are straight forward to model in principle, however, a major concern with reserves is the large number of reserve constraints which combine to significantly increase the processing time, often for little or no additional accuracy.

RiskOffsets are also required for the modelling of reserves. These are calculated for SPD using TransPower's RMT tool which is a complex non linear dynamic model of the generation and load on the Grid. RMT is too complex to implement within EMarket.

In EMarket and EMO dispatch, pricing and power flow are achieved by Energy Link’s IQP software module.

Optimum Dispatch

The dispatch objective function from Schedule G6 of Part G of the EGRs is to maximise the net purchaser surplus.

EGR Dispatch Objective

DP E1.jpg